Case Study
PWD Project
The PWD Project at DG04 station in Rumaila, started on 26-May-23, was meticulously divided into four distinct scopes, each addressing specific aspects crucial to the project's success and functionality. These scopes encompassed a wide range of tasks, from foundational groundwork to intricate piping and mechanical installations, all aimed at ensuring the seamless operation of the PWD system.
The PWD Project at DG04 station in Rumaila, started on 26-May-23, was meticulously divided into four distinct scopes, each addressing specific aspects crucial to the project's success and functionality. These scopes encompassed a wide range of tasks, from foundational groundwork to intricate piping and mechanical installations, all aimed at ensuring the seamless operation of the PWD system.
In tandem with the vessel foundation, Fiafi's dedicated workforce undertook the excavation, fabrication, and concrete casting of 117 concrete supports. These supports were meticulously crafted to meet exacting specifications, contributing to the structural integrity and reliability of the PWD infrastructure.
Demonstrating their proficiency in structural engineering and fabrication, Fiafi's skilled team fabricated and installed 74 steel supports and 3 Pipe Bridges at the workshop and station. These critical components played a vital role in supporting and connecting various elements of the PWD system, ensuring seamless operation and longevity.
Fiafi's commitment to excellence extended to the completion of 6804 DIA INCH during Pre-TAR at both the workshop and site, as well as TAR Phase 1, 2 & 3. This comprehensive approach encompassed fabrication, welding, and installation activities, reflecting Fiafi's dedication to delivering high-quality results across all project phases.
OVERVIEW
- 117 Concrete Supports
- 1 Vessel Foundation
- 74 Steel Supports
- 3 Pipe Bridges
- 6804 Total DIA Inch
- 258952 Manhours